Security policy
Business Continuity and Disaster Recovery Policy and Plan
How GSP keeps working through an outage and restores its systems, with a tested recovery time objective of 4 hours and recovery point objective of 24 hours.
- Version
- 1.0
- Effective
- November 2, 2026
- Next review
- November 2027
- Owner
- Global Signing Partners management
1. Purpose and objectives
This policy and plan keep GSP’s critical services running, or restore them quickly, after a disruption: a provider outage, data loss or corruption, a cyber attack, or loss of key people.
| Objective | Target |
|---|---|
| Recovery Time Objective (RTO): time to restore the portal after a disaster | 4 hours |
| Recovery Point Objective (RPO): maximum data loss, measured in time | 24 hours |
| Bad release rolled back | 15 minutes |
2. Critical functions and manual workarounds
| Function | If the portal is unavailable |
|---|---|
| Order intake | Clients email or phone orders to GSP staff, who log them |
| Agent assignment | Staff call and email signing agents from the agent roster export |
| Document exchange | Clients send packages directly to the assigned agent through their own secure channel |
| Status updates | Staff update clients by phone and email until the portal is back, then enter the history |
3. Resilience and backups
- The portal runs on Vercel’s managed platform across multiple availability zones; code is in a private GitHub repository, so the application can be redeployed at any time.
- Portal data and documents are stored in Cloudflare R2 (Eastern U.S.), which keeps redundant copies within the region.
- Every day an automated job copies all data and documents to a separate backup bucket in a different region (Western U.S.). Backup copies of documents and the daily data snapshots cannot be deleted or overwritten by anyone for 30 days (an immutability lock), which protects against ransomware and mistakes. Daily snapshots are kept for 90 days.
- Inside the portal, the first change of each day to a data file keeps a copy of the previous version, and simultaneous edits are detected, so nothing is silently overwritten.
- Backup results are logged, and a failed backup alerts the security contact.
4. Recovery procedures
| Scenario | Recovery |
|---|---|
| Faulty release | Roll back to the previous deployment in the hosting dashboard, then fix forward |
| Records corrupted or deleted | Restore the affected data files from the most recent good daily snapshot; restore deleted documents from the backup copy |
| Storage region lost or unavailable | Point the portal at the backup bucket (one configuration change and redeploy), then rebuild the primary from it |
| Hosting provider outage | Communicate with clients and agents, use manual workarounds, and redeploy from source control once service returns or to an alternate project |
| Email provider outage | Staff contact clients and agents directly; queued notifications are re-sent |
| Loss of key person | Infrastructure credentials are held in a shared password vault accessible to GSP management |
5. Communication
Clients and signing agents with active orders are told about an outage expected to last more than one hour, with an estimate and the manual workaround, and again when service is restored.
6. Testing
A restore test is run at least once a year and after major changes to storage or backup. The test restores a full copy from the off-site backup into an isolated location, checks every record and document, and runs the portal against it. The time taken and the age of the restored data are measured against the RTO and RPO. Results and any fixes are recorded below.
Restore test log
| Date | Scenario | Measured | Result |
|---|---|---|---|
| November 2, 2026 | Full restore of all data and documents from the off-site backup into an isolated location, then the portal run against the restored copy | Data restored in under 1 minute (278 files, 551 MB, 15 seconds) plus a few minutes to switch the portal over, against the 4-hour RTO. Data loss at the time of the test was under 1 hour, against the 24-hour RPO | Passed. Every record matched the backup snapshot, all 269 documents were byte-identical to the live copies, and orders and documents opened normally through the portal. The test copy was then deleted |
Part of the GSP Information Security Program. Download the full program (PDF) or see all policies.
